Opening: Doka Plant

On top “form”: Opening of the ATP-designed Doka plant in Lipetsk (Russia)

Lipetsk, 5th September 2019 – The Doka facility in Russia, which was designed by ATP TLP Moscow, has been ceremoniously opened. The city of Lipetsk, 400 km to the southeast of Moscow, is thus home to the Austrian formwork company’s first production facility outside the EU. Doka GmbH is one of the world’s leading developers, manufacturers, and operators of formwork technology.

The heart of building is the 3,500 m2 hall in which Doka produces formwork with a capacity of around 65,000 m² for Russia and for markets with similar requirements. Open, light-flooded office areas and an employee canteen with an open-air terrace are located right next door.
“The completion of our new production facility also represents our commitment to sustainability and in-house production. This will both enhance our independence and strengthen our competitiveness”, explained Manfred Jungwirth, Doka’s Director of Production Business Development, at the opening ceremony.

 

    Opening ceremony – The ATP-designed Doka facility in Lipezk has been completed. Photo: Doka
    Opening ceremony – The ATP-designed Doka facility in Lipezk has been completed. Photo: Doka
    The design capacity of the new building is around 65,000 m² of formwork. Photo: Doka
    The design capacity of the new building is around 65,000 m² of formwork. Photo: Doka

    Contact us

    Contact us

    We are delighted about your interest! Please give us a little information so that we can get in touch with you.