BIM – A central data model
At ATP architects engineers, clients, architects, structural engineers, mechanical and electrical engineers, specialist consultants and all others involved in the process design simultaneously and in real-time within a central building data model.
Based on the specific need for information at each stage of design, construction and operation, the data model is being continuously developed and filled with information. All disciplines work on the same model and have access to the latest information at any time.
After completion and handover to the client, the facility managers can take over the data and use it in the management, repair and maintenance of the building.