https://atp.directus.app/assets/111ec2c1-fda8-4616-95d1-8457ea7806f3.jpg?v=1296

Innovation Center

Construction start for a sustainable office building for EagleBurgmann

Wolfratshausen, 01.03.2023
Construction start Office and administration Innsbruck  

As part of their process for ensuring the ongoing green and competitive future of their company, EagleBurgmann commissioned us with the integrated design of an “Innovation Center” at the company facility in Wolfratshausen. Construction started at the beginning of March.

ATP Innsbruck joined EagleBurgmann at a symbolic groundbreaking ceremony to mark the start of construction of its climate-fit office building. The building seeks to use targeted measures to achieve long-term climate neutrality. A geothermal plant acts as the main energy source, while ventilation plant with heat recovery and a large-scale roof and façade-mounted PV system also forms part of the concept. In order to reduce building material-related CO₂-emissions, all non-loadbearing external walls are made of timber.

We’re delighted that sustainable sealing solutions will be developed for our clients in future in a sustainably built Innovation Center.

Andreas Raps

CEO

EagleBurgmann

Exterior view of the office building planned by ATP architects engineers for EagleBurgmann in Wolfratshausen.

Weitere spannende Themen

https://atp.directus.app/assets/befe6ef9-0626-40ae-8740-e2cec459b0db.jpg?v=1287

Blog

5/13/2025

Renovation as a Model for the Future

Vienna Green Hub – From an Outdated Existing Building to a Climate-Neutral Flagship Project
Office and administration Design and Research Revitalization
https://atp.directus.app/assets/d5853bb7-683d-418e-872a-911b56f64cc4.jpg?v=1275

News

2/7/2025

Landscape for Vocational Learning

Award-winning design for the expansion of the Tiroler Fachberufsschule Lohbach
Design and Research Innsbruck Research and specialist design  
https://atp.directus.app/assets/c2f4a9a8-3aa5-4826-965c-46fd8e08208e.jpg?v=1284

News

1/15/2025

1st Prize for sustainable transformation

Revitalization of the Rupprecht-Haus in Gevelsberg
Design and Research Frankfurt Competition  
https://atp.directus.app/assets/43868df9-160f-41c8-9327-4212a4ae2653.jpg?v=1290

News

4/16/2024

Green Light for Tyrolit

Groundbreaking ceremony: Start of work on the expansion of Plant 5 at the production facility in Stans, which has been planned by ATP.
Construction start Innsbruck Production and logistics

Follow us